Continuous 20 MHz CPU/SRAM Scope Test

VS Code tasks

Choose Tasks: Run Task, then Build Pico - Phase 6 20 MHz scope diagnostic to build only, or Flash Pico - Phase 6 20 MHz scope diagnostic to build and deploy. The flash task force-enters BOOTSEL; save work and finish running tests first. Follow the hardware and power prerequisites below.

z80_stage06_scope_20mhz is an isolated diagnostic for observing the clock, instruction fetches and SRAM activity without Z80 I/O reports or clock pauses. It is separate from both the full-memory frequency screens and the one-hour arithmetic soak.

Building this target does not deploy it. Do not flash, disconnect serial, or attach/move probes during another running test. Finish and retain that test's results first.

Purpose and limits

After slow loading and verification, the Pico generates continuous nominal 20 MHz PWM while the Z80 repeatedly checks arithmetic, flags, comparisons, loops, stack behavior and SRAM data. No Z80 IN, OUT, block-I/O instruction, or Pico I/O-trap handler participates in the running workload.

The Pico USB console still accepts commands. This is no Z80 port I/O, not an absence of USB communication with the Pico. s and h do not pause PWM or inspect live SRAM. There are no periodic result reads, bank reloads, BUSREQ transactions or automatic one-hour stops.

Property Scope diagnostic
Target z80_stage06_scope_20mhz
Supervisor clock 120 MHz, selected before USB and Z80 execution
Z80 clock 20 MHz, scope-measured; PWM divider 1, period count 6, three HIGH/three LOW
Runtime Continuous until explicit stop, disconnect, or power loss
SRAM work area 2000h-FFFFh, 56 KiB
Live CPU result reports None
Results Reserved SRAM mailbox, retrieved only after stopping
Detected Z80 mismatch Save first failure, enter HALT; PWM keeps running
Operator stop x immediately stops PWM, then reads the mailbox with assisted clocks
Console disconnect Fail closed; reconnect and explicitly request result retrieval
Automatic PASS Never

The configured clock is not a measured frequency. A continuously switching CLK does not prove that arithmetic or memory checks are still advancing: the CPU might have halted, stalled or branched incorrectly. This target intentionally gives up the soak's live progress timeout and result supervision to provide an uninterrupted measurement interval.

Maintained sources

The original soak selects the same assembly workload with port reports enabled; the scope image selects SRAM reports instead. The original soak's assembled bytes are preserved by this separation.

What the Z80 tests

The soak guide's arithmetic and instruction descriptions also describe the shared scope workload:

  1. Check 16 nested CALL levels, HL/DE/BC preservation, SP recovery and the lower stack guard.
  2. Perform 16 passes through 128 fixed operand pairs:

    • 16-bit ADD, ADC with carry, and SBC with/without borrow.
    • Result and documented arithmetic-flag assertions.
    • Shift/add multiplication, checking the low 16 product bits.
    • Signed and unsigned less/equal/greater decisions.
  3. Check every vector-table end pointer and the outer repetition count.

  4. Fill the entire 56 KiB work area, then read and compare the entire area.
  5. Commit a completed-phase count in SRAM and advance to the next pattern.

Patterns are low address byte, high address byte, complemented low byte and complemented high byte. Four phases make a cycle. Each complete phase credits 57,344 SRAM-byte checks, 22,528 arithmetic assertions, five stack checks and 17 loop checks: 79,894 logical checks.

Additional scope-reporting instructions include LD HL,(nn), LD (nn),HL, LD (nn),IX, and LD (nn),DE. They update memory only. The normal/failure OUT blocks are excluded by assembly selection.

Memory map

Address Purpose
0000h-0EFFh Code and local loop state; assembler rejects overlap with mailbox
0F00h-0F1Fh 32-byte scope result mailbox
0F20h-0FFFh Unused resident reserve
1000h-19FFh 128 independent expected-answer records
1A00h-1FFFh Stack reserve; lower guard at 1A00h
2000h-FFFFh Destructive SRAM work area

The Pico builds, loads and verifies the complete lower 8 KiB image once. Only the Z80 addresses and accesses SRAM, including assisted loading and post-stop reads. Neither the mailbox nor code/table/stack regions receive the destructive work-area sweeps; this is not full-64-KiB pattern coverage.

Build without deploying

From the repository root, with the firmware toolchain configured:

export PATH="$HOME/.local/share/arm-gnu-toolchain-15.3.rel1/bin:$PATH"
cmake -S . -B build/scope20 -G Ninja -DPICO_BOARD=pico2_w
cmake --build build/scope20 --target z80_stage06_scope_20mhz

Output:

build/scope20/src/stage06_sram_dma/z80_stage06_scope_20mhz.uf2

This separate build directory leaves the earlier soak/screen UF2s intact. Normal firmware retains its existing clock limit. The scope target uses the isolated 20 MHz clock/CPU chain and does not install an I/O trap.

The VS Code Flash Pico - Phase 6 20 MHz scope diagnostic task force-flashes the UF2 without a Phase 9 stop/flush handshake. Use it only when interrupting the current firmware is safe and the populated board has external +5 V applied before USB.

Later deployment and console operation

The following is a later manual procedure, not part of building.

  1. Finish the current test and save its final results. Close its serial owner; never open competing USB serial readers.
  2. For the current circuit, all eight active packages must be installed and powered. Apply external 5 V before USB; disconnect USB before removing external 5 V. Never program the populated board with only USB power.
  3. Attach the scope probes with the board powered off, following the 20 MHz clock measurement procedure.
  4. Identify the intended Pico with picotool info -a. With exactly one intended Pico attached, flash and verify:

    picotool load -v -x \
      build/scope20/src/stage06_sram_dma/z80_stage06_scope_20mhz.uf2 -f
    

    If multiple devices are attached, select the current --bus and --address explicitly. Require flash verification success.

  5. Open the Pico USB serial connection with DTR asserted. For example:

    picocom -b 115200 /dev/cu.usbmodem1101
    

    Use the actual port on your host. Check the no-I/O diagnostic banner and clk_sys=120000000Hz; boot/reconnect never starts the test.

  6. Send f + Enter. Wait for RUN: nominal=20000000Hz before measuring. Loading, verification and startup reset clocks are not the continuous scope interval.

Command Behavior
f + Enter Start a fresh load, verification and continuous run; stopped state only
s + Enter Report controller state, not live CPU progress
h + Enter Show help without disturbing the running clock
x immediately During RUN, stop and retrieve results; during assisted operations, abort
r + Enter Read the stopped mailbox after a previously started run, including after reconnect

x discards the remainder of its input line. Press Enter before another command. A serial disconnect stops safely without retrieving results or restarting. After reconnect, use r + Enter; SRAM must have remained powered. Results survive reset, not loss of SRAM power, and a fresh f replaces them.

Scope captures

Use the DHO814 20 MHz setup to measure at Z80 CLK pin 6, not just Pico GP2.

The project prototype capture in the oscilloscope guide shows a 20.0000 MHz cursor reading and 50.000 ns period. Its statistics also include a 9.9502 MHz minimum; inspect the waveform for that low reading before using the capture to qualify missed edges or jitter. Capture only after RUN and before x/disconnect. There should be no deliberate reporting-related clock gaps during that interval.

For SRAM work, use the existing read/write capture groups. The first part of each phase performs arithmetic and stack traffic, followed by a full work-area fill and verification. Not every observed write is a work-area write: stack and mailbox updates are also legitimate memory cycles. Repeat captures with the logic analyzer as needed to identify addresses/data.

On a detected mismatch, HALT leaves the Pico PWM running; Z80 HALT can still produce fetch/refresh activity. Do not interpret either as continuing useful work. Stop and retrieve the mailbox after your captures.

Interpreting stopped results

x stops PWM and asserts RESET before starting slow Z80-assisted reads. These readback clocks are outside the measurement interval. Retrieval finishes with RESET asserted, SRAM inhibited and Pico data paths isolated. Do not assume a stopped PWM signal is physically LOW.

Mailbox offset Meaning
00h-03h ASCII SCP1, format identifier
04h 00h prepared/not started, 01h started, E1h committed mismatch
05h Busy flag: 01h while committing progress/failure, 00h when stable
06h-09h Completed phases, unsigned 32-bit little-endian
0Ah Last completed pattern, 0-3; FFh before any completion
0Bh Reserved
0Ch, 0Dh Failure stage and vector/context
0Eh-0Fh Failure address, little-endian
10h-11h Actual value, little-endian
12h-13h Expected value, little-endian
14h-1Fh Reserved

The busy flag is written first and cleared last for both progress and failure commits. A stop during an update yields INCONCLUSIVE, rather than crediting a potentially torn count or failure record. An invalid magic, state, last-pattern/count relationship or failure record is also inconclusive. The 32-bit phase counter must not be allowed to wrap; counts after wrap are not meaningful.

Example of eight completed phases:

SNAPSHOT: phases=8 completed_cycles=2 sram_byte_checks=458752 math_vectors=16384 completed_phase_checks=639152
RESULT: no mismatch recorded in retrieved mailbox; not proof of live progress, not a timed PASS or timing qualification

Only completed phases are credited. A stable started mailbox with zero phases is inconclusive. A positive count proves that those completions were recorded, not that the CPU was still advancing at the moment you stopped it.

Failure stages and field meanings match the soak failure identifiers, but this target stores the fields in SRAM instead of emitting a packet. The Z80 commits failure data before setting the failure state and clearing busy, then HALTs. HALT itself is not monitored by a Pico input.

Loader, clock, verification and readback faults print explicit FAIL messages. An incomplete/invalid mailbox never becomes a PASS. There is no automated duration criterion or live first-fault notification in this scope target.

Host validation

Run controller tests natively and execution tests in the Apple container:

cmake -S src/common/tests -B build/host-control -G Ninja
cmake --build build/host-control --target scope_test math_soak_test math_soak_14h_test
ctest --test-dir build/host-control -R '^(scope_|math_soak_)' --output-on-failure
python3 scripts/z80_container.py test

Controller tests cover DTR/manual gating, verification, quiet RUN behavior, post-stop readback, disconnect/reconnect, invalid/torn mailboxes and failures. The C emulator executes the actual scope image through two cycles and rejects any IN or OUT, including failure paths. It checks mailbox commit ordering, a 16-bit counter carry into the high word, all arithmetic failure stages, the stack guard and first/middle/last SRAM corruption.

The original soak controller and instruction tests remain regression checks. Host validation and an ARM build are not physical scope measurements or a bench pass for this newly built target.